Wednesday, 20 July 2011

The real alternative to plasterboard

Fermacell is a high performance gypsum multi-purpose board that combines the properties of solid blockwork with the speed and flexibility of conventional drywall, providing superior fire, sound and impact performance with the ability for the home owner to hang fixtures directly to the board. A non skilled finishing system achieves a skim type finish. Visit us at stand J174 for more information.

Web link: www.fermacell.co.uk

Email: fermacell-uk@xella.com
Email (brochure): petya.spencer@xella.com

Tuesday, 3 May 2011

Fermacell GCC’s Product Ranks High on TheFutureBuild.Com Site!


Fermacell GCC, a leading manufacturer of a sustainable building board
used for walls, floors and ceilings, announced today the launch of a new
 website portal that profiles its product, www.thefuturebuild.com.

“We are thrilled at achieving such a high ranking by an independent source. 
This reinforces to the market the sustainable credentials of Fermacell,” said
Nathan Kirk, Regional Manager of Fermacell GCC, who sees the new
thefuturebuild website becoming an invaluable source for designers,
architects, and building contractors to find sustainable building products.

“Besides being an exclusive source for sustainable products for the industry,
the site will save people time, as all the necessary materials are located in
one central area www.thefuturebuild.com,” noted Nathan. He also
congratulated thefuturebuild team members for providing a single source for
designers anywhere in the world to review and select suitable materials to
help them achieve their sustainable construction needs.

 
According to Nathan, Fermacell’s commitment to sustainability in the region is
also supported through their relationship with Emirates Green building
Council, Bayer ECB Program and support of the Gulf chapter of RIBA.

Fermacell, which achieves an overall rating of B+ within the future build web 
portal, contributes to LEED, BREEAM or Estidama ratings within a number of
sections including materials, indoor air quality, acoustics and durability.
To view the Fermacell listing, click here:

 
For further information, please contact:
Nathan Kirk
Regional Manager
Fermacell GCC
Phone:  00971 50 2474668
Email: Nathan.kirk@xella.com
Website: www.fermacell-gcc.com

Friday, 7 January 2011

The Big 5 2010 is over for another year...

From record breaking number of contacts, our largest stand to date, and interactive demonstrations with the acoustic sound box, the durability corner and rotating sample display the Fermacell stand had it all. Fermacell has been supplying materials into GCC since 2006 and this was the 3rd Big 5 exhibition we have attended.

The Fermacell team would like to thank all those who expressed interest and requested meetings; it was our best show ever.

Please add this website to your favourites or come back to check the website for local Exhibitions, Project references and case studies which discuss the use of Fermacell and other related construction design ideas.

We would like to invite those who require further information or site meeting to contact our local manager:

Nathan Kirk
Regional Manager GCC
Mob: 00971 50 2474668
Email: nathan.kirk@xella.com

Thursday, 18 November 2010

High walls benefit from strength of Fermacell

Fermacell wall board is at the heart of Brockington Sports Hall, the curved metal cladding making it a distinctive facility within thestate-of-the-art Brockington College in Leicestershire.

This striking three-storey school has 8,400 sq. metres of internal floor space and was designed by Building Design Partnership (BDP).

It features a central heart space – consisting of the dining and assembly area – that runs up through the school as an open atrium. The building is designed to provide a flexible, adaptable space for teaching in the 21st century.

The sports hall, which took 12 months to build, occupies 594 square metres with 9.6m high walls. The vast expanse of walling is notable for the smooth blemish free surface which has been achieved using two layers of 12.5mm Fermacell board installed horizontally.

Fermacell is inherently stronger than conventional plasterboard and, as well as its strength and acoustic properties, it also provides fire, impact and moisture resistance.

The strength comes from its gypsum matrix, which is reinforced with recycled paper and, because of its higher density, is far more effective in reducing sound transmission.

It is simple to install – although the technique is slightly different to plasterboard – and does not need a wet plaster skim to produce a suitable surface for painting.

Subcontractors DEN Building Finishes Ltd of Wigston in Leicestershire, undertook the installation of the Fermacell and were impressed with the technical support and advice provided by Xella Dry Lining Systems, manufacturers of the board.

Fermacell is inherently stronger than conventional plasterboard and, as well as its strength and acoustic properties, it also provides fire, impact and moisture resistance. The strength  comes from its gypsum matrix, which is reinforced with recycled paper and, because of its higher density, is far more effective in reducing sound transmission.

DEN Managing Director Vance Kearney commented: “Another product had initially been specified for the sports hall walls, but we were far from happy with the technical support, or speed of response given by that company. When we approached Fermacell, they pulled out all the stops. From site survey, a detailed project specification was provided in days and full height – 9.6m – steel studwork was delivered shortly after from Germany to site.

“The Fermacell boards were laid horizontally onto the Protektor standard metal stud system, utilising two layers of 12.5m Fermacell board. The speed of installation of Fermacell board with its quick and simple system, helped bring the project back on track,” he said.

Main contractors on the £20 million new-build college were Marriott Construction, part of Kier Group. The crescent shaped scheme comprises three galleried teaching levels grouped around a central social and resource space comprising dining and assembly areas, offices and library. The sports hall, equipped with impressive changing facilities, is located on the 1st floor of the building, supported on a concrete frame cantilevering over 4 metres over the main entrance.

BDP Architect Associate Paul Owen commented: “The total build cost of the project was circa £15m and has been designed to maximise the available flexible space within the College. This building really does provide a wonderfully versatile working environment.”

The old Brockington School was demolished and the new building erected on the site. Catering for 900 children aged 10-14, it is the only Church of England Voluntary Aided Secondary High School in the County of Leicestershire, with origins dating back to 1759.

Project: Sports Hall at Brockington College, Leicester
Architect: BDP
Main Contractors: Marriott Construction, part of Kier Group.

Fermacell at the heart of new Evesham Leisure Centre

More than 20,000 square metres of Fermacell board has been used in three different types of application within a superb new £10.75 leisure Centre complex built for Wychavon District Council in Worcestershire.

Evesham Leisure Centre’s facilities include a 25 metre swimming pool and a 12 metre studio pool. Both pools partition walls are lined with Fermacell Powerpanel H2O boards, which provide an ideal base for tiling and other wall finishes. In addition, 12.5mm Fermacell board has also been utilised as an external backing board for the building’s cladding, as well as on many of the interior walls.

The aesthetically pleasing building – designed by project architects Roberts Limbrick – features a dramatic green, copper clad curved entrance and climbing wall enclosure providing a unique, recognisable focus to the 4,500 m2 Centre, which has been developed to replace an outdated facility opened more than 30 years ago.

Peter Head, Project Manager with Wychavon District Council, commented: “The Centre opened to the public on the 7th September. Facilities within the old building had become rather tired – particularly the swimming pool and changing spaces.

“The new facilities are first class. Apart from a slightly wider main pool we have incorporated a studio pool, which has a moveable floor, and can be used for a wide range of activities including aqua aerobics, fit-swim sessions, parent and baby classes, disability groups and for youngsters learning to swim.”

“Most of the Centre’s upstairs internal walls are made from a combination of Fermacell and steel stud and the contractor was able to install them quickly. When Fermacell is fully prepared it provides a very good finish.”

Facilities

The main entrance to the Centre leads directly to the main foyer space which contains a dramatic climbing wall, reception and café with views directly into the pool area and up to the fitness suite above. The reception area leads to a multi purpose room providing facilities for dance, exercise classes, soft play and functions. The swimming pools, wet health suite, sports hall and changing facilities are also on this floor.

A large changing village with facilities for group and accessible changing leads to a 25m x 5-lane level deck Community Pool, a seperate12m x 7m level deck studio pool, with movable floor for flexibility of use and the wet health suite which includes two spa pools, a steam room and sauna. Spectator access to the main pool is provided direct from the café area. The sports hall provides 4 badminton courts and facilities for basketball, five-a-side football, gymnastics, dance and exhibitions) with associated storage and dry changing. The warm colour and high level birch cladding give the space a high quality and attractive feel and contrast with the blue
Granwood flooring.

Next to the reception, lift and stair access is provided to the first floor area which includes a fitness suite with space for up to 125 stations and three treatment rooms offering a range of beauty treatments. A large aerobics studio with storage is also provided, together with facilities for staff.

John McCabe, Project Manager or main contractor Galliford Try, commented: “We specified the use of Fermacell on this project. One of its strengths is that it is ideally suited to the environment being made from recycled materials and being 100% recyclable. Running along the ground and first floors are 16 feet radius walls comprising steel Protektor track and Fermacell.”

Peter Newth, Associate Director with Roberts Limbrick commented: “Externally, the building form was developed to provide an important, evocative community leisure building for Evesham, whilst respecting its important position. There are no immediate neighbouring buildings with which the building must relate and, therefore, the building elevations were designed to create a dynamic, exciting high quality and low maintenance building enclosure with materials selected with regard to durability and quality of appearance in the long term.

“We took particular care to make the activities visible throughout the building and there are opportunities to view into all the main spaces from the adjacent circulation.

“All spaces within the Centre are designed to be fully accessible to all and access to the main pool includes both hoist and stepped access. Ceiling mounted trackway hoists are also provided to two dedicated changing facilities.

“Many environmental features are incorporated include the use of CHP (with waste heat utilised to heat the swimming pools), automated lighting control and ventilation heat recovery. Light tubes through the roof provide natural lighting to many internal spaces and roof mounted ‘wind catchers’ provide natural ventilation to the sports hall.

“Internally Fermacell boards (with glued joints) were used by the contractor Galliford Try, for lightweight wall as these would achieve all the requirements for fire, acoustics and severe duty rating using a single board rather than using the many different combination of boards needed with other systems. This enabled partition walls to be constructed both rapidly and to the required standard providing a very high quality, robust finish throughout the first floor. A high standard of finish is provided throughout with a restrained but dateless colour palette of blues, white and natural timber.”

“Wall materials are a combination of glass, natural cedar, patinated copper standing seam cladding, polyester powder coated cladding and framing and local colour stock facing brick.

“It is capped by a polyester powder coated standing seam roof and fascias colour matched to the copper cladding. The external glazing to the pool hall, café and climbing area provides a highly visible ‘showcase’ of the internal facilities.”

The extensive parking facilities are to be landscaped to incorporate foraging routes for migratory bats and a new bat enclosure provides mitigation for habitat lost as a result of the demolition of the former depot buildings. Permeable block paving provides attenuated run off from the parking areas.

Fermacell’s Area Sales Manager (South West and West Midlands) David Prout commented: “This project clearly demonstrates the versatility of Fermacell boards. Not only can they be used on the creation of internal walls, but they are being increasingly recognised as a cost-effective weatherboard for vented and EPS rainscreen solutions.

“In addition, the Fermacell Powerpanel H2O boards are proving to be the ideal solution for wetroom applications including: bathrooms, hospitals, hotels, kitchens, leisure centres and, of course, swimming pools,” he concluded.


Project: Evesham Leisure Centre, Worcestershire
Architect: Roberts Limbrick Main 
Contractors: Galliford Try.

Fermacell provides outstanding performance in new Gateway Building

More than 20,000 m2 of Fermacell dry lining board has been used in the construction of the new £5.6 million Gateway Building at the University of Cumbria, Lancaster Campus.

Not only was Fermacell selected for the internal walls but has – for the first time on a major project in this country – been utilised as an external carrier board for the structure’s rainscreen cladding.

Whilst Fermacell has been widely used in rainscreen applications on timber frame constructions throughout Europe for the past 20 years, it has not – until now – been marketed for such an application in the UK.

The environmentally friendly design of the University of Cumbria incorporates natural ventilation and the integration – wherever possible – of local natural materials such as Cumbrian Stone and Zinc cladding.

Construction of the Gateway began in March 2007. It is located opposite the Keep at the top of the main driveway into campus and stands on the site once occupied by Harrison Lodge and Princess Margaret Hall.

The main reception area for the Campus has also moved into the Gateway from its previous location in the Keep.

Keith Cheshire, project architect with Wilson Mason architects commented: “The Gateway is the flagship and focal point of the Lancaster Campus and designed to achieve a BREEAM ‘very good’ rating. Prior to its construction, many student services were disparately spread out across the campus, but are now to be found under one roof.

“The structure has four floors each extending to around 800m2 and the main external feature is a 10m cantilever. Within the complex is a student welfare services arena, a central campus catering outlet and office accommodation for 70 people.

“The lower ground floor contains the catering and kitchen facilities, whilst the ground floor is a ‘one-stop’ shop known as the ‘I-Zone’ which acts as a hub for all student inquiries regarding university administration such as finance, student loans and accommodation through to medical advice. There is also a café on this level. Facilities on the first floor ‘Skills Zone’ comprise a resource zone for the students and private appointment rooms where they can talk to members of staff.

“The top floor incorporates two first class catering facilities Room 301 and VIEW which, as the name suggests, has with superb views overlooking the city of Lancaster and Morecambe Bay. “Throughout the building are a substantial number of feature walls incorporating the Fermacell product. One wall of particular note – by the main staircase – runs from ground floor to roof level and incorporates lighting effects.

All the bulkheads and trims are also made from Fermacell. “Among the advantages of using Fermacell is the level of SFT surface treatment that can be achieved and the durability of the product. A student building is subjected to more than its fair share of knocks and it’s important hat the walls can withstand such day-to-day treatment.”

Project Manager Russell Calvert of main contractors Pinington Limited of Lancaster, commented: “The building is ostensibly designed to provide student support services. Fermacell’s durability is ideal in an environment in which knocks are inevitably going to take place.”

Fermacell Area Manager Phil Mattatia from Fermacell commented: “The use of 12.5mm Fermacell as an external backer board proved very successful in this application. It was exposed to the rain for nearly three months before the rainscreen cladding was installed and coped admirably with the conditions.

“Rigorous testing of Fermacell as an external backing board was undertaken last year at the Taylor Woodrow Technology Centre in Leighton Buzzard in accordance with strict guidelines set down by the CWCT (Centre for Windows and Cladding Technology).“No other competitive board systems – to our knowledge – have gone through this test process, which has been developed specifically for rainscreen evaluation.

Fermacell passed the tests with flying colours and, given it is up to 50% cheaper per m2 when compared with established products, we anticipate a growing demand for Fermacell being used in external applications.” The University of Cumbria has more than 15,000 students at campuses and sites in Carlisle, Ambleside, Penrith, Lancaster, Whitehaven, Barrow and London. It provides a wide range of degree courses in subjects including business, the arts, teaching, nursing, outdoor studies and sport, to name just a few. To find out more, visit the website at http://www.cumbria.ac.uk/.

Project: Gateway Building at The University of Cumbria
Architect: Wilson Mason and Partners
Main Contractors: Pinnington Limited.

Fermacell’s environmental credentials secured eco-friendly British primary school project

The environmental methods of manufacture and 100% recyclability of Fermacell partitioning boards have led to the use of the product in the first British primary school to be built with a totally eco friendly innovative timber panel system made from recycled wood cuttings.

The pioneering construction of the school will feature 600 Eurban panels of cross laminated layers of timber from sustainably managed forests in Switzerland.

Initially the internal walls in the new St Agnes C of E Primary School in Longsight, Manchester, were to be of painted timber. However, the environmental credentials of Fermacell convinced architects and contractors to install 3,000 sq m of the fibre re-inforced gypsum board to benefit from its strength, impact resistance, and fire and acoustic qualities.

The pioneering construction of the school will feature 600 Eurban panels of cross laminated layers of timber from sustainably managed forests in Switzerland. Off cuts from the saw milling industry are being fabricated into load bearing timbercomponents and shipped to Manchester and positioned by crane and connected together, eliminating the need for concrete and steel to achieve a ground breaking approach to construction.

The £6.2million building will house 270 primary school children and a further 90 pre school children in nine classrooms on three levels.

It will also feature a roof top playground. Fermacell’s Phil Mattatia says: “We are delighted to be part of this exciting project. The overall objective has been to achieve an impressive environmental performance with a reduced carbon footprint. The timber panel system is achieving this, and our partitioning is giving added benefits while meeting the environmental targets.”

Project: St Agnes C of E Primary School, Manchester
Architect: Robinson Architects
Main Contractors: Willmott Dixon.